Tech Notes from L10: Polarizability of the Bound Neutron
Tech Note 1 Writing Tech Notes Using Latex and PAW
Quick note on combining figures and text in Latex. Also has tips on creating EPS files from PAW. Specific LATEX instructions are for the HP.
Tech Note 3 MC vs Data Progress
Progress summary from June 13 comparing MC and Experiment. No attempt had yet been made to correct timing and pulse height run-by-run.
Tech Note 4 Tagger Timing Alignment
Alignment of tagging timing signals using event 8 data.
Tech Note 7 PN Bar X Position Alignment
Alignment of X position for limited region of bars by comparison of data to MC. Concentrated on L2-10 through L2-12.
Tech Note 8 PN L2-11 Gain
Examination of a single bar as a function of energy by comparison of data and MC.
Tech Note 9 Calibration Transformation for SASY
Description of current and proposed transformation to convert from Raw packed data to calibrated unpacked data. Almost ready for release.
Tech Note 10 Experiment-Monte Carlo Comparison
First official iteration of limited geometry scenario by Marvin, Mark and Alina.
Tech Note 13 Scintillator Quenching
Short description of scintillator quenching as it was modelled in L7/L8 by James Tonnison.
Tech Note 15 SASY Labelling
Description of labelling scheme for SASY subsystems.
Tech Note 16 Experiment-Monte Carlo Comparison Status for L10
Comparison of COMPTON_AA experimental sample with MC. May 98. Discussion of calibration, MC, and separation plots.
Tech Note 17 Pi0 Reconstruction - EXP vs MC
First pass at pi0 reconstruction comparing EXP and MC
Tech Note 19 Crosstalk in PN Bars
Quick note describing solution of X position quandry and cross talk in the PN Bar splitters.
|